INSP-Final Inspection | 11/19/2012 | 11/20/2012 | 11/20/2012 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 11/8/2012 | 11/8/2012 | 11/8/2012 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the fire sprinkler corrections have been addressed.
|
INSP-Sprinkler Rough-in | 9/25/2012 | 9/27/2012 | 9/27/2012 | A | PART |
Troy Cobbley
|
|
|
Sprinkler piping above lay-in ceiling tle can be covered. Issues that need addressed prior to a final sign off are missing upright head at one location, overspaced upright heads at another location, standard responce (existing) pendants installed in rooms where per the plans the heads are to be changed to quick responce, standard and quick responce heads mixed in the same compartment and areas with no sprinkler protection due to soffits. Ceiling plans does not match either due to ceilings installed where none were shown and soffits/low ceilings that have either been deleted or relocated. Contact plan review for guidance on resubmittals/as-builts.
|