INSP-Final Inspection | 10/19/2012 | 10/22/2012 | 10/22/2012 | P | PASS |
Forrest France
|
|
|
Scope of work finished. Fire sprinkler permit finaled.
|
INSP-Final Inspection | 10/19/2012 | 10/22/2012 | 10/22/2012 | A | PASS |
Forrest France
|
|
|
QOD on the dry system installed, trip testing passed. Fire sprinkler permit final approved.
|
INSP-Final Inspection | 10/18/2012 | 10/19/2012 | 10/22/2012 | A | FAIL |
Forrest France
|
|
|
Dry system failed trip testing.
|
INSP-Sprinkler Rough-in/Hydro | 10/5/2012 | 10/5/2012 | 10/5/2012 | P | PASS |
Troy Cobbley
|
|
|
24 horu test passed.
|
INSP-Sprinkler Rough-in/Hydro | 10/3/2012 | 10/4/2012 | 10/4/2012 | A | PART |
Forrest France
|
|
|
Begin 24 hr. air test @ 11:30 AM at 42 psig.
|
INSP-Sprinkler Rough-in/Hydro | 10/3/2012 | 10/3/2012 | 10/3/2012 | P | PART |
Forrest France
|
|
|
OH hydrostatic test of the new dry system passed.
|
INSP-Sprinkler Rough-in/Hydro | 9/28/2012 | 9/28/2012 | 9/28/2012 | P | FAIL |
Forrest France
|
|
|
Overhead dry system hydrostatic test failed due to pressure loss at the guage.
|
INSP-Sprinkler Rough-in | 8/15/2012 | 8/16/2012 | 8/16/2012 | A | PART |
Forrest France
|
|
|
Overhead work at the new restrooms okay for cover- see dated plan annotations.
|
INSP-Final Inspection | 7/12/2012 | 7/16/2012 | 7/16/2012 | P | PART |
Forrest France
|
|
|
This is a partial final, just checking the office part. Richard is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 7/6/2012 | 7/6/2012 | 7/6/2012 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler rough-in at the additional office area okayed.
|
INSP-Sprinkler Rough-in | 7/3/2012 | 7/3/2012 | 7/6/2012 | P | PART |
Forrest France
|
|
|
Modifications to the underground supply line included in the scope of work are approved for bury.
|