Permit Information
Permit NumberFIR12-00365
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 4262 N EAGLE RD
Project NameGRACE BIBLE CHURCH
Customer Number 
ePlanReviewNo
Description
The fire sprinkler scope of work consists of providing protection for the first level of an existing building and a new addition. The existing has existing protection in the attic and basement. The new building will have the protection on the first level and in the attic. Several attic areas are protected with small antifreeze systems. The attic system in the new building utilizes special application sprinklers both single directional and back to back. Large orifice extended coverage sprinklers with 20’x20’ spacing are being used in various locations. The systems are supplied by 4” underground piping through a 4” reduced pressure backflow preventer. There are 4” and 3” mains. The branch lines are predominately 1¼”. The insulation is on the roof deck in the new addition. Therefore, the attic fire protection is a wet pipe system. The existing building fire protection will be connected to the new system. The underground was installed under permit FIR12-00205.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/31/20131/31/20131/31/2013PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in/Hydro1/25/20131/25/20131/25/2013PPASS
DetailsTroy Cobbley
Overhead hydro passed
INSP-Sprinkler Rough-in12/12/201212/12/201212/12/2012PPASS
DetailsTroy Cobbley
See the city approved plans for locations where piping can be covered. I posted a stop work order on the front of the building due to hardlids continuing to be installed prior to a sprinkler rough-in inspection. I had a previous conversation with contractor about this. Stop work order states "Stop all sheet rock that is covering sprinkler piping. Cover inspection is required".
INSP-Supply line flush11/14/201211/14/201211/14/2012PPASS
DetailsTroy Cobbley
The underground supply line flush passed.
INSP-Sprinkler Rough-in11/13/201211/14/201211/14/2012APASS
DetailsTroy Cobbley
The entry lobby sprinkler piping is ok to re-cover. Tim Frost approved as-builts have been marked up by me for location and have been left on the job site with the sprinkler fitter.
INSP-Sprinkler Rough-in11/8/201211/8/201211/8/2012PCANC
DetailsTroy Cobbley
Cancel per Perly Daniel
INSP-Sprinkler Rough-in11/7/201211/7/201211/7/2012PFAIL
DetailsTroy Cobbley
Joe Snyder was requesting a rough-in inspection for the main lobby entry area. I could not give approval due to the piping arrangement not matching the approved plans. The BB heads have been removed and standard coverage upright heads installed. Also the piping has been covered by sheet rock without approval. I spoke to the job site superintendant about a possible stop work order if covering pipe prior to an inspection continued. He agreed that it would not happen again. Plans need to be resubmitted showing the piping changes in all areas and access provided for the following inspection.
INSP-Sprinkler Rough-in10/17/201210/17/201210/17/2012PPASS
DetailsTroy Cobbley
The sprinkler piping in the drive thru canopy can be covered.
INSP-Sprinkler Rough-in9/19/20129/20/20129/20/2012PCANC
DetailsTroy Cobbley
Underground Rough-in. Scott Carter is the contact at ###-####. Phone #: ###-#### >> Inspection requested via web by Kindel de Leon Inspection cancelled from web by: Kindel de Leon