INSP-Final Inspection | 9/18/2012 | 9/19/2012 | 9/19/2012 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work approved for final status.
|
INSP-Sprinkler Rough-in/Hydro | 9/17/2012 | 9/17/2012 | 9/17/2012 | P | PASS |
Forrest France
|
|
|
Rough-in work finished and passed inspection. Previous correction items are complete.
|
INSP-Sprinkler Rough-in | 8/28/2012 | 8/28/2012 | 8/28/2012 | P | PART |
Troy Cobbley
|
|
|
There are three rooms that the walls to go to the deck to provide an enclosed area to operate the provided upright sprinkler or provide a ceiling with a pendant sprinkler or the final option is to meet coverage as provided in NFPA 13 chapter 8. I also found one pendant head located 4" too far from a wall. Piping can be covered except for the problem areas.
|