INSP-Final Inspection | 10/15/2012 | 10/15/2012 | 10/16/2012 | P | PASS |
Forrest France
|
|
|
Overhead fire sprinkler work passed final inspection and walkthrough.
|
INSP-Sprinkler Rough-in/Hydro | 9/20/2012 | 9/20/2012 | 9/20/2012 | P | PART |
Forrest France
|
|
|
Overhead hydrostatic test of the wet and antifreeze systems passed.
|
INSP-Sprinkler Rough-in | 9/19/2012 | 9/19/2012 | 9/19/2012 | P | PART |
Forrest France
|
|
|
Overhead rough-in including the wet and antifreeze system is approved for cover. Noted two painted pendent heads in need of replacement, discussed construction rating of the riser room with the general contractor.
|
INSP-Sprinkler Rough-in | 8/21/2012 | 8/21/2012 | 8/21/2012 | P | PART |
Forrest France
|
|
|
Overhead work at the mens and womens restroom, yard service, and west entry vestibule/soffit are okay to cover. Locations marked and dated on plans.
|