INSP-Final Inspection | 4/10/2013 | 4/10/2013 | 4/10/2013 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 4/10/2013 | 4/10/2013 | 4/10/2013 | P | PASS |
Troy Cobbley
|
|
|
jonathan Phone #: ###-####
|
INSP-Final Inspection | 4/9/2013 | 4/10/2013 | 4/10/2013 | A | FAIL |
Troy Cobbley
|
|
|
doors are locked no access
|
INSP-Sprinkler Rough-in/Hydro | 2/6/2013 | 2/6/2013 | 2/6/2013 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Sprinkler Rough-in | 11/29/2012 | 11/30/2012 | 11/30/2012 | A | PASS |
Troy Cobbley
|
|
|
The first floor breeze-way piping can be covered. The heat tape/insulation has been installed.
|
INSP-Sprinkler Rough-in | 11/21/2012 | 11/21/2012 | 11/21/2012 | P | PASS |
Troy Cobbley
|
|
|
Tenting has been corrected and new plans have been approved. Piping can be covered except for the supply piping that crosses the breeze way at the first floor.
|
INSP-Sprinkler Rough-in | 11/16/2012 | 11/19/2012 | 11/19/2012 | A | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for locations where piping is not covered by the tenting material and heads are blocked by a wall in the restrooms. Also plans need to be resubmitted showing all of the elevation changes, additional elbows and the pipe routing changes.
|