INSP-Final Inspection | 11/29/2012 | 11/29/2012 | 11/29/2012 | P | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
INSP-Supply line flush | 10/2/2012 | 10/3/2012 | 10/3/2012 | A | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed
|
INSP-Sprinkler Rough-in/Hydro | 10/1/2012 | 10/1/2012 | 10/1/2012 | P | NR |
Forrest France
|
|
|
No access to the UG gate valve to complete flushing operation.
|
INSP-Sprinkler Rough-in/Hydro | 9/10/2012 | 9/10/2012 | 9/10/2012 | P | PASS |
Troy Cobbley
|
|
|
Underground supply hydro passed.
|
INSP-Sprinkler Rough-in | 8/23/2012 | 8/23/2012 | 8/23/2012 | P | PART |
Forrest France
|
|
|
UG fire supply line approved for cover including the additional 11 deg ell.
|