INSP-Final Inspection | 4/18/2013 | 4/18/2013 | 4/18/2013 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 4/9/2013 | 4/10/2013 | 4/10/2013 | A | CANC |
Forrest France
|
|
|
Work will be complete by 11:30 am. Plans are in the riser room Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in | 2/4/2013 | 2/4/2013 | 2/4/2013 | P | PART |
Forrest France
|
|
|
Correction items at second floor apt. 200 verified for completion- okay to cover.
|
INSP-Final Inspection | 1/30/2013 | 2/1/2013 | 1/31/2013 | A | CANC |
Forrest France
|
|
|
Call 30 minutes prior to arrival Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 1/24/2013 | 1/24/2013 | 1/24/2013 | A | PART |
Forrest France
|
|
|
See dated annotations on plan regarding areas okayed including removal of the control valve in the basement and relocation of one pendent head at the 3rd floor unit 304. Work in apt. 300 is not complete, need to adjust placement of the added head in unit 200- see clouded plan note- min. spacing is 8'-0".
|