INSP-Final Inspection | 1/31/2013 | 2/1/2013 | 2/1/2013 | A | PASS |
Forrest France
|
|
|
Final inspection items completed and passed. Permit finaled.
|
INSP-Final Inspection | 1/30/2013 | 1/31/2013 | 1/31/2013 | A | FAIL |
Troy Cobbley
|
|
|
Provide city approved plan, provide correct orfice for the test connection, provide head box with extra heads/wrench, provie service tag, test bell and remove the handles from the backflow.
|
INSP-Sprinkler Rough-in | 11/8/2012 | 11/8/2012 | 11/8/2012 | P | PART |
Forrest France
|
|
|
Overhead okay to cover, insulation at piping verified.
|
INSP-Sprinkler Rough-in | 11/5/2012 | 11/5/2012 | 11/5/2012 | P | PART |
Forrest France
|
|
|
Overhead rough-in inspection completed. Be aware of possible light fixture obstructions at the mud room and laundry room. Cover approval pending tenting/insulation for cold cavity protection.
|