Permit Information
Permit NumberFIR12-00638
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 5662 N QUAIL SUMMIT PL
Project NameQuail Ridge 5662
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of a residential NFPA 13D system for a new single floor home. A new 2”x75’± poly pipe will supply a 1½” riser in the garage. Extended coverage 20’x20’ sprinklers have been utilized on CPVC piping. The piping will be tented in the attic space.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/24/20131/25/20131/25/2013PPASS
DetailsTroy Cobbley
Permit finaled. Bell has been relocated and tested.
INSP-Final Inspection1/23/20131/24/20131/24/2013AFAIL
DetailsTroy Cobbley
The outside alarm bell needs to be relocated to the front of the home. This was verified with Romeo. Once the bell has been retested the permit can be finaled.
INSP-Supply line flush1/23/20131/24/20131/24/2013APASS
DetailsTroy Cobbley
Underground flush passed
INSP-Final Inspection1/22/20131/23/20131/23/2013PCANC
DetailsTroy Cobbley
Cancel per Robert since the water is not turned on yet.
INSP-Supply line flush1/22/20131/23/20131/23/2013PCANC
DetailsTroy Cobbley
Cancel per Robert since the water is not turned on yet.
INSP-Final Inspection1/16/20131/18/20131/18/2013ACANC
DetailsForrest France
Roberts is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Supply line flush1/16/20131/18/20131/18/2013ACANC
DetailsForrest France
This is an ug flush. Roberts is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in12/7/201212/7/201212/7/2012PPASS
DetailsTroy Cobbley
The underground supply piping under the house has been attached to the underside of the floor joists as discussed.
INSP-Sprinkler Rough-in12/5/201212/5/201212/5/2012PPASS
DetailsTroy Cobbley
I met the builder, Garrett, on site and he made repairs that I needed. Piping can be covered.
INSP-Sprinkler Rough-in12/3/201212/4/201212/4/2012AFAIL
DetailsTroy Cobbley
This is a tenting inspection. The General Contractor is the contact. David Paul. Thanks Phone #: ###-####.

I left voice message for contact stating I was on the way to the project. I found some of the tenting repaired but other areas I found where the plastic tenting can easily be moved and is not secured. Also one vertical riser appears to need batt insulation to protect it if it extends above the blow-in insulation when installed. Piping still can not be covered.
INSP-Sprinkler Rough-in11/29/201211/30/201211/30/2012APART
DetailsTroy Cobbley
The sprinkler piping can not be covered due to the tenting not being adequate in many locations. However the underground supply piping can now be buried.
INSP-Sprinkler Rough-in11/27/201211/27/201211/27/2012PFAIL
DetailsTroy Cobbley
Reinspect for the underground failed. No work to correct the bury depth has been performed.
INSP-Sprinkler Rough-in/Hydro11/21/201211/26/201211/26/2012APART
DetailsTroy Cobbley
The overhead hydro test passed. The underground supply line still is not ok for cover due to the minimum depth not being met.
INSP-Sprinkler Rough-in/Hydro11/20/201211/21/201211/21/2012PPART
DetailsTroy Cobbley
The overhead hydro test failed due to a visable leak on the cpvc piping. The rough-in generaly passed except none of the tenting has been installed. Also the plans need to be resubmitted showing the 5 additional 90's between hydraulic node point 7 and 101. Also sprinkler coverage is required in the shower or a lintel of 8" as per our discussion. Piping can not be covered yet.
INSP-Sprinkler Rough-in/Hydro11/19/201211/21/201211/20/2012ACANC
DetailsTroy Cobbley
This is an ug&oh hydro and rough to cover inspection. Robert is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in11/19/201211/20/201211/20/2012AFAIL
DetailsTroy Cobbley
This was an ug to cover inspection which failed due to the piping not meeting the min. bury depth of 4'6".
INSP-Sprinkler Rough-in/Hydro11/19/201211/21/201211/19/2012ACANC
DetailsTroy Cobbley
This is an ug hydro. Robert is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in11/19/201211/20/201211/19/2012ACANC
DetailsTroy Cobbley
This is an ug to cover. Robert is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus