INSP-Final Inspection | 1/7/2013 | 1/7/2013 | 1/7/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 12/31/2012 | 12/31/2012 | 12/31/2012 | P | FAIL |
Troy Cobbley
|
|
|
Plan modifications need to be submitted showing the actual wall layout, new devices/deleted devices and new circuits. Also include the correct model of duct smoke detectors used on the hvac units. I also will need the breaker identified and locked out, building map posted and NFPA 72 forms.
|
INSP-Final Inspection | 12/28/2012 | 12/28/2012 | 12/28/2012 | P | FAIL |
Troy Cobbley
|
|
|
Project is not ready for inspection. The system had not been turned on or pre-tested prior to inspection. I performed a walk around and noted on the city approved plans located where strobes are over spaced, have been added or deleted. It appears that strobes to the east of column line 8 will be blocked by racking that exceeds 6' in height. We did set off the audio/visuals after activating the panel and I found that neither the audio or visuals are sync'd. Per the fire alarm plans examiner due to small safety factor for the EOL voltages any changes will require a plan modification. Per Romeo it will be ok for the owner to stock if the fire alarm is inspected to verify that sprinkler and hvac monitoring is in place.
|