INSP-Final Inspection | 5/21/2013 | 5/21/2013 | 5/21/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Bells have been relocated and function correctly
|
INSP-Final Inspection | 5/20/2013 | 5/21/2013 | 5/21/2013 | A | FAIL |
Troy Cobbley
|
|
|
Need the light fixture installed between the two pendant heads in the entry from the garage.
|
INSP-Conference | 5/20/2013 | 5/20/2013 | 5/20/2013 | P | DONE |
Troy Cobbley
|
|
|
Frank and I discussed the relocation of the electric alarm bells to the nearest point ot the building to the street. Per Potter Electric the bell must be mounted vertical with the weather proof back boxes (per NEC).
|
INSP-Final Inspection | 5/16/2013 | 5/17/2013 | 5/17/2013 | A | FAIL |
Troy Cobbley
|
|
|
Move the alarm bells to the front/street of the buildings and provide orfice in the inspectors test that matches the smallest orfice sprinkler used.
|
INSP-Sprinkler Rough-in | 4/25/2013 | 4/26/2013 | 4/26/2013 | A | PASS |
Troy Cobbley
|
|
|
Another residence is ok to cover. See sticker on window.
|
INSP-Sprinkler Rough-in | 3/29/2013 | 3/29/2013 | 3/29/2013 | P | DEFR |
Forrest France
|
|
|
lonnie Phone #: ###-#### *Incorrect permit number requested for inspection
|
INSP-Sprinkler Rough-in | 3/20/2013 | 3/20/2013 | 3/20/2013 | P | PASS |
Troy Cobbley
|
|
|
Tenting passed. "Ok to cover" posted on window.
|
INSP-Sprinkler Rough-in | 3/7/2013 | 3/7/2013 | 3/7/2013 | P | PART |
Troy Cobbley
|
|
|
Rough-in passed but piping can't be covered until the tenting is completed/inspected.
|
INSP-Sprinkler Rough-in | 2/4/2013 | 2/5/2013 | 2/5/2013 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler piping ok to cover in the far left unit. Tenting was repaired in two locations as I waited.
|
INSP-Sprinkler Rough-in | 1/31/2013 | 2/1/2013 | 2/1/2013 | A | NR |
Forrest France
|
|
|
lonnie Phone #: ###-#### *Tenting/insulation incomplete
|
INSP-Sprinkler Rough-in | 12/31/2012 | 12/31/2012 | 12/31/2012 | P | PART |
Troy Cobbley
|
|
|
See the city approved plans for residences where the sprinkler rough-in is approved. I noted in two locations where pendant sprinkler heads are missing. Piping can not be covered until a tenting inspection has bee approved.
|
INSP-Sprinkler Rough-in | 12/19/2012 | 12/19/2012 | 12/19/2012 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the tenant space/residence where the piping rough-in passed. The walkin shower needs to be totally enclosed, as per discussion, or sprinkler protection required. Lonnie is going to move the pendant head over 2" in the master bath so that coverage is provided under the soffit. As per a later telephone dicussion with Lonnie, he is going to add a pendant in the entry way to provide coverage on the far side of a surface mounted light fixture. As-builts will be needed showing these changes and the deletion of one pendant in a storage area that is now a 1/2 bath. Sprinkler piping can not be covered until a tenting inspection has been completed.
|