Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR13-00001
StatusFinaled
Name PEAK ALARM
Site Address 255 N STEELHEAD WAY
Project NamePrimary Weapons Systems
Customer Number 
ePlanReviewNo
Description
1/25/13 Plan Modification (9 initiating devices affected): This plan modification is to incorporate previous redlines (i.e. adding a remote annunciator), and to show additional duct detectors not previously known about.
1/3/13:This fire alarm permit is to replace an existing manual fire alarm system with a new sprinkler monitoring system. This permit scope of work includes the removal of the (now) non-required manual system and components and installing a new Fire Alarm Control Panel, remote annunciator panel, new pull station, new smoke detector, elevator recall functions, magnetic door lock release on general alarm, heat detector, duct detectors for HVAC monitoring/shutdown, and fire pump monitoring. An AES RF radio is being provided instead of a DACT for central station communications.
Associated building permit: BLD12-02789
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/31/20132/1/20132/1/2013APASS
DetailsForrest France
Previous correction notice items verified for completion. Voltage monitor for the elevator shunt trip added while on site, as-builts recieved. Duct detectors and recall functions tested okay. Points map posted. Permit finaled.
INSP-Final Inspection1/29/20131/29/20131/29/2013PFAIL
DetailsTroy Cobbley
All fire pump devices were retested today and passed. Started to test the elevator recall and found that there are programing issues. We tried to test duct smoke detectors but found that some have not been wired for shutdown of the hvac units. Inspection to be rescheduled when the remaining items, as listed above, have been corrected and tested.
INSP-Final Inspection1/28/20131/28/20131/28/2013PFAIL
DetailsTroy Cobbley
Everything tested today except for the AES netcon needs to be retested. The signals sent to central station do not match what is being tested at the job site. Phase reversal and pump running are reversed. The manual pull station in the pump room is mounted too high.
INSP-Final Inspection1/25/20131/25/20131/25/2013PCANC
DetailsTroy Cobbley
Canceled due to time constraints. Brent Phone #: ###-####