INSP-Final Inspection | 2/20/2013 | 2/20/2013 | 2/20/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 2/19/2013 | 2/20/2013 | 2/20/2013 | A | CANC |
Troy Cobbley
|
|
|
There is a fees hold on this project. Fees need payed prior to another inspection.
|
INSP-Final Inspection | 2/19/2013 | 2/19/2013 | 2/19/2013 | P | FAIL |
Forrest France
|
|
|
New strobe at the west side did not operate. Remainder of previous correction items completed.
|
INSP-Final Inspection | 2/15/2013 | 2/15/2013 | 2/15/2013 | P | FAIL |
Forrest France
|
|
|
Correction items include damper operations, notification appliances per 18.3.3.2, agent release signage, openings at the room enclosure.
|
INSP-Final Inspection | 2/11/2013 | 2/12/2013 | 2/12/2013 | A | NR |
Forrest France
|
|
|
Final pending panel supervision
|