INSP-Final Inspection | 4/11/2013 | 4/12/2013 | 4/12/2013 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 4/11/2013 | 4/11/2013 | 4/11/2013 | P | FAIL |
Troy Cobbley
|
|
|
As-builts were not on site for review.
|
INSP-Final Inspection | 4/10/2013 | 4/11/2013 | 4/11/2013 | A | FAIL |
Troy Cobbley
|
|
|
Valve for the forward flush broke and the plan modifications were not on site for review.
|
INSP-Sprinkler Rough-in | 4/3/2013 | 4/4/2013 | 4/4/2013 | P | PART |
Troy Cobbley
|
|
|
Rough-in is ok but need verification that additional fittings in the upper and lower storage room sprinkler system do not adversly effect the hydraulic calculations. Need model number of the air compressor verified for the 4.5 cfm requirement. Need to verify that the backflow preventor is ok (wrong model number). Need approved notes for review. Need storage signage per note #5. As-builts, if time does not require resubmittals, showing the additional piping and heads under both stairways. Also solid shelving has been installed, some of which is 8' x 24'. I contacted Cam and Tim Frost and I'm waiting for an official responce if this shelving is ok.
|
INSP-Sprinkler Rough-in | 3/1/2013 | 3/4/2013 | 3/4/2013 | A | CANC |
Troy Cobbley
|
|
|
I stopped at the job site but the plans are locked in the job box. Per Mark Jensen the inspection will be rescheduled.
|
INSP-Sprinkler Rough-in | 2/28/2013 | 3/1/2013 | 3/1/2013 | A | CANC |
Troy Cobbley
|
|
|
Overbooked. Rescheduled for monday. I spoke to Mike with Shilo about this.
|
INSP-Sprinkler Rough-in | 2/28/2013 | 2/28/2013 | 2/28/2013 | P | PART |
Troy Cobbley
|
|
|
See the city approved plans for locations in the main shop/service area and detail/carwash areas where corrections are required. The plans need to be re-submitted showing the additional branchline and heads which will effect the remote areas. Branch line restraints and retaining straps are missing in several locations. Pipe clearance at the CMU penatrations are not big enough....ect.
|