INSP-Final Inspection | 7/9/2013 | 7/10/2013 | 7/10/2013 | P | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final walkthrough, permit finaled.
|
INSP-Final Inspection | 7/8/2013 | 7/9/2013 | 7/9/2013 | A | CANC |
Forrest France
|
|
|
Final inspection. Please call Rick at above number prior to arrival Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in | 6/28/2013 | 6/28/2013 | 6/28/2013 | A | PART |
Forrest France
|
|
|
Overhead work at grid ceilings in rooms 303, 304, and 305 including the meeting room are okay to cover.
|
INSP-Sprinkler Rough-in | 6/6/2013 | 6/6/2013 | 6/6/2013 | A | PART |
Forrest France
|
|
|
Fire sprinkler work at the sheetrock soffits in meeting room 301 approved for cover. Plans clouded and dated.
|
INSP-Final Inspection | 4/24/2013 | 4/24/2013 | 4/24/2013 | A | PART |
Forrest France
|
|
|
"Phase one" work completed satisfactory.
|
INSP-Sprinkler Rough-in | 3/22/2013 | 3/22/2013 | 3/22/2013 | A | PART |
Forrest France
|
|
|
Okay to cover sheetrock lids and cloud ceiling areas in "phase one" as noted on approved plans.
|