Permit Information
Permit NumberFIR13-00086
StatusFinaled
Name TRI STATE ELECTRIC
Site Address 12601 W BRIDGER ST
Project NameIDAHO POWER-BOISE CENTER WEST
Customer Number 
ePlanReviewNo
Description
This fire alarm permit is to replace the existing required fire alarm system with a new required manual fire alarm system per owner’s request. This permit scope of work includes sprinkler system monitoring (dry and wet systems), a remote annunciator panel, pull stations in each of the two riser rooms, smoke detectors above the panels, full notification, monitoring existing VESDA systems, access control door release on general alarm, and duct detectors w/relays for HVAC monitoring/shutdown.
Associated building permit: BLD12-02338
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Sprinkler Rough-in/Hydro9/20/20169/20/20169/20/2016PCANC
DetailsTroy Cobbley
Geoff Phone #: ###-####-please call to meet for access
INSP-Final Inspection9/20/20169/20/20169/20/2016PPASS
DetailsTroy Cobbley
Permit finaled. Fire alarm contractor was not there. I did not receive nfpa 72
INSP-Final Inspection1/16/20161/16/20161/16/2016AFAIL
DetailsJim Page
Inspection consisted of checking interface between clean agent system panel to main fire alarm panel, clean agent panel reported to main fire alarm panel with correct addressing. Verified low air alarm, verified solenoid activation for pre-action valve trip, verified tamper valves on west pre-action as well as wet system tamper valves on west side fire sprinkler systems. Water flow pressure switch for pre-action system did not report as a water flow, reported to panel as a supervisory, water flow on pre-action needs to report as (latching) general fire alarm. Inspected east side pre-action system, verified low air alarm, verified water flow pressure switch for east pre-action with alarm test line, could not get pre-action solenoid to activate, had low air alarm as well as three smoke detectors (photo smokes in server room) in alarm with no solenoid activation. Exterior fire bell did not activate with water flow on pre-action systems, exterior bells with associated systems must ring with water flow. Contractor will reschedule inspection when items are repaired.
INSP-Final Inspection6/12/20146/16/20146/16/2014PFAIL
DetailsTroy Cobbley
For final I need the solenoid (low air, water flow) for both deluge systems verified.
INSP-Final Inspection8/28/20138/30/20138/30/2013AFAIL
DetailsTroy Cobbley
Need revised as-builts showing the 110 cd strobes and the deluge system solenoids, the west deluge system flow/pressure switch is reporting as a PIV supervisory and the Low Air pressure switch did not report at all. Waiting on the solenoid switch for the east deluge system as well.
INSP-Final Inspection8/28/20138/29/20138/29/2013AFAIL
DetailsTroy Cobbley
See the city approved plans for locations where strobes need to be relocated due to being overspaced and mounted outside of their listing. Additional devices will be required in acouple of locations. No testing of the a/v devices took place.
INSP-Final Inspection5/15/20135/16/20135/16/2013APART
DetailsTroy Cobbley
See the city approved fire alarm plans for locations tested and passed today. Area was roughly the Orange hi-lighted, dated 5/15, area on the general contractors phasing plan.
INSP-Sprinkler Rough-in5/14/20135/15/20135/15/2013PCANC
DetailsTroy Cobbley
Next phase is not ready for a final yet. I found overspaced audio/visual devices and in one location a device that is not wired up yet. Will be rescheduled.
INSP-Final Inspection4/29/20134/30/20134/30/2013PPART
DetailsTroy Cobbley
Fire alarm device testing in the LSO area passed inspection.
INSP-Final Inspection4/19/20134/22/20134/22/2013PPART
DetailsTroy Cobbley
See the city approved plans for location, clouded in red, where the fire alarm system has been inspected and passed. Per Jeremy with Alta Construction this is the first phase they are requesting occupancy.
INSP-Conference4/22/20134/22/20134/22/2013ADONE
DetailsTroy Cobbley
Myself, the alarm contractor and the electrician discussed the overspace ceiling mounted a/v' in the main corridor and womens restroom. Also the manual pull station in the mechanical room is mounted too high. Ceiling tile will need to be installed at the facp for the containment of smoke.
INSP-Conference4/1/20134/1/20134/2/2013PDONE
DetailsTroy Cobbley
I spoke with both the general contractor and the electrician about contacting the fire dept for approval for phasing the project and partial occupancy.