INSP-Final Inspection | 9/30/2013 | 10/1/2013 | 10/1/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 9/19/2013 | 9/23/2013 | 9/23/2013 | A | FAIL |
Troy Cobbley
|
|
|
Need the two duct smoke detectors to shut down the hvac units immediately to final this permit.
|
INSP-Final Inspection | 8/28/2013 | 9/4/2013 | 9/4/2013 | A | FAIL |
Troy Cobbley
|
|
|
New duct smoke detectors are listed to be mounted outside as per Joe with System Sensor. But duct smoke detectors were not wired up for power. Inspection stopped and will need to be resceduled.
|
INSP-Final Inspection | 8/9/2013 | 8/12/2013 | 8/12/2013 | A | FAIL |
Troy Cobbley
|
|
|
Provide knox box, provide map at facp, provide signage on FACP door, provide dedicated/locked out circuit for the FACP, provide listed enclosures for the duct smoke detectors and then test them, provide verification the kitchen hvac unit does not require a detector, provide correct zone descriptions at central station and retest everything
|
INSP-Final Inspection | 7/11/2013 | 7/12/2013 | 7/12/2013 | P | FAIL |
Troy Cobbley
|
|
|
Provide proof of payment for Bench Sewer Dist. (lee sperl ###-####), provide FIR permit for the hood suppression system, provide final inspection for the fire sprinkler permit. Test all fire alarm devices and adjust candella as discussed in the open area.
|