INSP-Final Inspection | 8/30/2013 | 8/30/2013 | 8/30/2013 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 8/15/2013 | 8/15/2013 | 8/15/2013 | P | PASS |
Troy Cobbley
|
|
|
Hydro test of the east system passed
|
INSP-Sprinkler Rough-in | 4/29/2013 | 4/30/2013 | 4/30/2013 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler piping in the LOC area is ok to cover.
|
INSP-Sprinkler Rough-in | 4/23/2013 | 4/23/2013 | 4/23/2013 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler protection is complete in Area "1A"
|
INSP-Sprinkler Rough-in | 4/17/2013 | 4/18/2013 | 4/18/2013 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations marked "ok" in red where sprinkler piping can be covered.
|
INSP-Sprinkler Rough-in | 4/10/2013 | 4/10/2013 | 4/10/2013 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for areas in phase 1 where the sprinkler piping can be covered.
|