Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR13-00197
StatusFinaled
Name CRANE ALARM COMPANY
Site Address 2588 N BOGUS BASIN RD
Project NameThe Pursuit Church
Customer Number 
ePlanReviewNo
Description
5/28/13 Plan Modification (8 initiating devices affected): This plan modification is to incorporate field modifications that include monitoring additional duct detectors, a PIV not previously shown, and a kitchen hood suppression system not previously shown. Modifications also include additional notification and incorporating previous redlines.
5/14/13: An early start request has been approved for this permit. This fire alarm permit is to replace an existing sprinkler monitoring only system with a full manual system that is now required due to the tenant occupancy type/load. The existing tenant spaces in the building meet fire separation requirements according to the contractor. This new system includes monitoring the existing sprinkler valves located in the Bogus Basin Office on the northeast end of the building, removal of non-required notification in the existing tenant spaces, a remote annunciator panel, duct detectors for HVAC shutdown/monitoring, full notification, a smoke detector above the FACP, a pull station, and an AES RF Radio instead of a DACT for fire alarm system reporting. Associated building permit: BLD12-03321
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/29/20136/3/20136/3/2013APASS
DetailsForrest France
Noted correction items verified for completion, plan modifications recieved, final inspection passed. Fire alarm permit finaled.
INSP-Final Inspection5/15/20135/17/20135/17/2013AFAIL
DetailsForrest France
Correction notice items include; provide WP notification appliances at rooms 118 and 119, MP at the riser needs to be between 42" and 48" AFF per note #33, new wall at hall 111 will require additional coverage, remove existing A/V at the fire riser room, post accurate points map at the panel per note # 51, post signage per note #53, relay for sound system shutdown did not function. Plan modification needed due to six existing duct detectors and one hood monitor not included on approved plans. Revise matrix to include sound relay. Revise one-line diagram to include all building duct detectors and initiating devices.