INSP-Final Inspection | 9/18/2013 | 9/19/2013 | 9/19/2013 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 9/3/2013 | 9/3/2013 | 9/5/2013 | P | PART |
Forrest France
|
|
|
Inspection intended for kitchen freezer only.
|
INSP-Sprinkler Rough-in | 9/3/2013 | 9/3/2013 | 9/5/2013 | P | PART |
Forrest France
|
|
|
Inspection for new dry pendent coverage at the kitchen freezer completed and passed.
|
INSP-Final Inspection | 7/18/2013 | 7/22/2013 | 7/22/2013 | A | PART |
Troy Cobbley
|
|
|
Dish washing area as marked on the city approved plans is ok for cover.
|
INSP-Final Inspection | 7/12/2013 | 7/15/2013 | 7/15/2013 | A | FAIL |
Troy Cobbley
|
|
|
Todays inspection was just a final for the "dry storage" area. Sprinklers are complete in this area but other areas are still under construction.
|
INSP-Sprinkler Rough-in/Hydro | 6/27/2013 | 6/27/2013 | 6/27/2013 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the two locations where sprinkler piping can be covered which includes dry storage and a short corridor.
|