INSP-Final Inspection | 9/20/2013 | 9/20/2013 | 9/20/2013 | P | PASS |
Forrest France
|
|
|
Fire alarm work passed after corrections made on site. Permit finaled.
|
INSP-Final Inspection | 9/17/2013 | 9/18/2013 | 9/19/2013 | P | FAIL |
Forrest France
|
|
|
Noted missing SD at the employee lunchroom E107. Overspaced notification adjusted while on site.
|
INSP-Final Inspection | 9/17/2013 | 9/17/2013 | 9/18/2013 | P | CANC |
Troy Cobbley
|
|
|
Rescheduled for tomorrow after 4pm with Forrest
|
INSP-Final Inspection | 7/18/2013 | 7/19/2013 | 7/19/2013 | A | PART |
Troy Cobbley
|
|
|
The two smoke detectors in the Dry Storage tested ok. The city approved plans only show one smoke detector. As-builts will need to be provided.
|