INSP-Final Inspection | 10/8/2013 | 10/8/2013 | 10/8/2013 | P | PASS |
Forrest France
|
|
|
C/N items field verified for completion. CPVC piping at the basement level now meets mfg. guidelines for exposed installation. Fire sprinkler permit finaled.
|
INSP-Final Inspection | 9/30/2013 | 10/1/2013 | 10/1/2013 | A | PART |
Forrest France
|
|
|
Completed walkthrough- Need to install missing heads at the garage/riser areas, secure control valves at the riser, include finish pack with spare heads, calc sticker, etc. Flow switch tested okay, one missing escutcheon installed while on site. Need to provide thermal barrier or meet conditions for exposed CPVC pipe at the ground level unfinished bedroom, family room, WIC and under stair storage areas.
|
INSP-Sprinkler Rough-in | 8/5/2013 | 8/6/2013 | 8/6/2013 | A | PART |
Forrest France
|
|
|
Tenting inspection completed satisfactory- okay to cover overhead rough-in.
|
INSP-Sprinkler Rough-in | 8/2/2013 | 8/2/2013 | 8/2/2013 | P | PART |
Troy Cobbley
|
|
|
rough-in passed. As-builts are needed prior to a final sign off that show theactual pipe routing. Piping can not be covered until a tenting inspection has been performed. Also the underground supply is a combined service with the domestic which, as noted on the city approved plans/notes, is not United Water approved.
|