INSP-Final Inspection | 8/27/2013 | 8/28/2013 | 8/28/2013 | P | PASS |
Forrest France
|
|
|
Final walkthrough completed. Fire sprinkler permit work finaled.
|
INSP-Final Inspection | 8/26/2013 | 8/27/2013 | 8/27/2013 | A | FAIL |
Troy Cobbley
|
|
|
Alot of ceiling tile is missing and needs to be installed prior to a final sign off.
|
INSP-Sprinkler Rough-in/Hydro | 8/20/2013 | 8/21/2013 | 8/21/2013 | P | PASS |
Troy Cobbley
|
|
|
East and west overhead systems passed hydro tests. Remaining sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in | 8/14/2013 | 8/14/2013 | 8/14/2013 | P | PART |
Forrest France
|
|
|
Overhead fire sprinkler work at 14 training rooms and adjacent corridors as marked and initialed on approved plans okayed for cover.
|
INSP-Sprinkler Rough-in | 7/25/2013 | 7/25/2013 | 7/26/2013 | P | PART |
Forrest France
|
|
|
Fire sprinkler work at the sheetrock soffits as marked/dated on approved plans are okay to cover.
|