INSP-Final Inspection | 10/10/2013 | 10/11/2013 | 10/11/2013 | A | PASS |
Craig D. Hanson
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 10/3/2013 | 10/4/2013 | 10/4/2013 | A | PART |
Forrest France
|
|
|
Concluded satisfactory 24 hr. air test within allowable pressure loss per NFPA13.
|
INSP-Sprinkler Rough-in | 10/1/2013 | 10/2/2013 | 10/3/2013 | P | PART |
Forrest France
|
|
|
Overhead hydrostatic testing completed okay
|
INSP-Sprinkler Rough-in | 10/2/2013 | 10/3/2013 | 10/3/2013 | A | PART |
Forrest France
|
|
|
Begin 24 hr. air test of the overhead dry system at 11:15AM @41psig.
|
INSP-Sprinkler Rough-in | 9/25/2013 | 9/26/2013 | 9/26/2013 | A | PASS |
Craig D. Hanson
|
|
|
Rough in pass-still need to look at riser and bracing for riser before cover.
|
INSP-Supply line flush | 9/4/2013 | 9/5/2013 | 9/6/2013 | P | DEFR |
Forrest France
|
|
|
Water supply not yet available to complete flushing per contractor.
|
INSP-Supply line flush | 9/5/2013 | 9/6/2013 | | P | |
Forrest France
|
|
|
Nate is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|