INSP-Final Inspection | 10/10/2013 | 10/11/2013 | 10/11/2013 | A | PASS |
Craig D. Hanson
|
|
|
trip test and pitot test pass
|
INSP-Sprinkler Rough-in/Hydro | 10/3/2013 | 10/4/2013 | 10/4/2013 | A | PART |
Forrest France
|
|
|
24hr. air test of the overhead dry system completed satisfactory.
|
INSP-Sprinkler Rough-in | 10/2/2013 | 10/3/2013 | 10/3/2013 | A | PART |
Forrest France
|
|
|
Begin 24 hr. air test of the new dry system at 10:30AM @42psig.
|
INSP-Sprinkler Rough-in | 9/26/2013 | 9/27/2013 | 9/27/2013 | A | PASS |
Troy Cobbley
|
|
|
Rough-in inspection for the outside canopy passed
|
INSP-Sprinkler Rough-in | 9/25/2013 | 9/26/2013 | 9/26/2013 | A | PART |
Forrest France
|
|
|
Need Rough-in inspection on fire sprinkler system. Please contact Nate with questions ###-#### Phone #: ###-#### >> Inspection requested via web by Stan Beus * NOTE- site inspection by C. Hanson w/ FIR13-00348*
|