INSP-Final Inspection | 9/27/2013 | 9/30/2013 | 9/30/2013 | P | PASS |
Forrest France
|
|
|
Previous correction items field verified, walkthrough completed. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 9/12/2013 | 9/13/2013 | 9/16/2013 | A | PART |
Forrest France
|
|
|
Inspection for cover completed at the grid ceiling areas- noted two overspaced heads in need of relocation- one at the SE corridor and one adjacent to the west side sheetrock soffit.
|
INSP-Final Inspection | 9/12/2013 | 9/13/2013 | 9/12/2013 | A | CANC |
Forrest France
|
|
|
Please call Colton 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
|
INSP-Sprinkler Rough-in | 8/16/2013 | 8/19/2013 | 8/19/2013 | A | PART |
Forrest France
|
|
|
Okay to cover fire sprinkler work at sheetrock ceilings as marked and dated on approved plans.
|