Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR13-00401
StatusFinaled
Name JBL FIRE PROTECTION LLC
Site Address 1377 S GOLDKING WAY
Project NameUnion Square Phase 2 Bldg. 15
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of protecting a new 3 level residential building per NFPA 13R

To construct a wood frame, three story, 28,041 sq. ft., 24 Unit Multi Family. All units exceed 800 sq. ft., are fully sprinklered W/ alarm. Work includes associated site work, footing & foundation, structural & non-structural framing; electrical, mechanical, plumbing, sprinkler & alarm work; fire-resistive construction between units, at stair enclosures or rated corridor breezeways; accessible Type 'A' & 'B' units; interior cabinetry, wall, floor and ceiling finishes and fixtures. All work shall comply with the approved drawings, the plan review report, and all applicable codes. This building will be fire sprinkled with a 13R sprinkler system. **SRZ** DRH13-00005 CUP12-00064
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/5/20142/11/20142/11/2014PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in/Hydro9/30/20139/30/20139/30/2013APASS
DetailsTroy Cobbley
Overhead hydro test passed
INSP-Sprinkler Rough-in/Hydro9/27/20139/27/20139/27/2013PCANC
DetailsTroy Cobbley
Jonothan Phone #: ###-####
INSP-Sprinkler Rough-in9/26/20139/27/20139/27/2013APASS
DetailsTroy Cobbley
overhead r/i bld 15 passed. Piping can not be covered until a tenting inspection