Permit Information
Permit NumberFIR13-00410
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 2290 S GEKELER LN
Project NameAeries Commons Phase #3
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of protecting a 2 level, 3 unit apartment building with a NFPA 13R system. A new 2”x60’± CPVC will be installed into and external riser room. There will be two 1½” risers supplied by a 2” backflow preventer. There is a remote 1½” FDC on the street side of the building. The concealed piping is 1¼” and 1” CPVC

(2290, 2292, & 2294 S Gekeler Ln) To construct a new 7,242 sq. ft., two story, three unit, apartment building. Each unit has separate entries, attached garages, and two stories. Unit #12 has a total of 1,878 square feet (1,277 square feet on the 1st story / 601 square feet on the 2nd story / 423 square feet garage). Unit #13 has a total of 2,144 square feet (1,107 square feet on the 1st story / 1,037 square feet on the 2nd story / 423 square feet garage). Unit #14 has a total of 1,832 square feet (890 square feet on the 1st story / 942 square feet on the 2nd story / 440 square feet garage). Each unit has 3 bedrooms and three bathrooms. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour vertical fire-partitions are required between dwelling units. This building is required to be fire sprinklered; as regulated by the fire department. Separate fire protection permits are required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/9/201312/10/201312/10/2013APASS
DetailsForrest France
Fire sprinkler work passed final inspection and walkthrough.
INSP-Final Inspection12/6/201312/9/201312/9/2013AFAIL
DetailsTroy Cobbley
The project related fire alarm sytem is not ready for testing.Tamper switches are not connected and the system is in "trouble"
INSP-Sprinkler Rough-in/Hydro12/5/201312/6/201312/6/2013APART
DetailsForrest France
Overhead hydrostatic testing for the first and second floors completed satisfactory.
INSP-Sprinkler Rough-in/Hydro12/5/201312/5/201312/5/2013PFAIL
DetailsTroy Cobbley
The hydro test failed for a second time. There is visible leakage at the left hand riser flow switch. Not sure where the leak is on the right hand riser.
INSP-Sprinkler Rough-in12/4/201312/5/201312/5/2013AFAIL
DetailsTroy Cobbley
Hydro test failed due to visible drop in pressure at the guages.
INSP-Sprinkler Rough-in9/6/20139/9/20139/9/2013APART
DetailsForrest France
Tenting inspection completed. Rough-in okay to cover.
INSP-Sprinkler Rough-in9/5/20139/5/20139/6/2013PPART
DetailsForrest France
Piping to added heads at the fireplace inserts needs nailer plates and freeze protection.
INSP-Sprinkler Rough-in9/3/20139/3/20139/5/2013PPART
DetailsForrest France
Overhead rough-in completed with the exception of upright coverage at two fireplace enclosures as shown per stamped plans. Tenting and cold cavity protection not yet installed.