INSP-Sprinkler Rough-in/Hydro | 11/15/2013 | 11/15/2013 | 11/15/2013 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 11/14/2013 | 11/15/2013 | 11/15/2013 | A | FAIL |
Troy Cobbley
|
|
|
No access to the building interior
|
INSP-Final Inspection | 11/15/2013 | 11/15/2013 | 11/15/2013 | P | PASS |
Troy Cobbley
|
|
|
Pass per Troy
|
DOC - Permit Finaled | | | 11/15/2013 | | DONE |
Christina Prado
|
|
|
|
INSP-Final Inspection | 11/7/2013 | 11/8/2013 | 11/8/2013 | P | FAIL |
Troy Cobbley
|
|
|
Tyco heads have been installed instead of the submitted Viking, provide one additional brace at the end of the 4" main and provide letter from manufacturer to support the installation of the hangers from the bottom of the z purlins.
|
INSP-Final Inspection | 10/30/2013 | 10/31/2013 | 10/31/2013 | A | FAIL |
Troy Cobbley
|
|
|
Left voice message that I would be there in 20 or 30 minutes. Arrived at job site and nobody was there. I did speak to Scott about needing to perform a rough-in inspection for the overhead system, branchline restraints and needing manufactures ok to hang piping from the bottom of the z-purlins as previously requested
|
INSP-Final Inspection | 10/25/2013 | 10/25/2013 | 10/25/2013 | P | PART |
Craig D. Hanson
|
|
|
final good. needs data plate and bird cage on head under stairs.
|
INSP-Sprinkler Rough-in/Hydro | 10/24/2013 | 10/24/2013 | 10/24/2013 | P | PASS |
Troy Cobbley
|
|
|
Above ground hydro passed
|
INSP-Supply line flush | 10/16/2013 | 10/17/2013 | 10/17/2013 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Sprinkler Rough-in | 10/16/2013 | 10/17/2013 | 10/16/2013 | A | CANC |
Troy Cobbley
|
|
|
Please schedule an underground RTC. Please call Trent 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
|
INSP-Sprinkler Rough-in | 10/10/2013 | 10/11/2013 | 10/11/2013 | A | PASS |
Troy Cobbley
|
|
|
Mezzanine piping is ok to cover.. I noted that light fixtures may block pendant heads based on flex/wiring locations next to pendants.
|
INSP-Sprinkler Rough-in | 10/2/2013 | 10/3/2013 | 10/3/2013 | P | FAIL |
Troy Cobbley
|
|
|
Todays inspection was only for the mezzanine/office area. Resubmit plans showing the pipe routing changes to the office/mezzanine area, the use of cpvc piping and flat face bushings. No piping to be covered at this time. Also noted sprinkler main piping hangers utilizing the bottom chord of the z purlins which will need approval.
|