Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR13-00495
StatusFinaled
Name AMERICAN FIRE PROTECTION LLC
Site Address 225 N 9TH ST Unit: 200
Project NameCLEARWATER ANALYTICS
Customer Number 
ePlanReviewNo
Description
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration.

(Sedgewick Building) Permit for T.I of existing tenant space on second floor. Tenant space created under BLD12-01166. Scope of work to include; demo of existing partition was per approved plans. Construction of new nonbearing partition walls for new office lay out including new break room per approved plans. Interior finish shall be per chapter 8, IBC.This building is fire sprinklered to meet high rise provisions. There are NO conference rooms approved on this floor only open office space, office space and break rooms space. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/11/201310/11/201310/11/2013PPASS
DetailsTroy Cobbley
Permit finaled.
INSP-Final Inspection10/4/201310/4/201310/4/2013PPART
DetailsForrest France
Verified previous C/N items are finished. Overhead work approved for cover at the drop ceilings throughout the remodel area. Final pending remainder of field ceiling tile install.
INSP-Sprinkler Rough-in9/30/20139/30/20139/30/2013PPART
DetailsForrest France
Overhead modifications at the grid ceiling areas okayed for cover. Provide verification calcs will support two heads fed by 1" pipe at the NE corner open office.