INSP-Final Inspection | 8/4/2014 | 8/5/2014 | 8/5/2014 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 7/25/2014 | 7/28/2014 | 7/28/2014 | A | FAIL |
Craig D. Hanson
|
|
|
Ssytm did not function properly, pre-sction devices not triping fire sprinkler.
|
INSP-Sprinkler Rough-in | 6/5/2014 | 6/6/2014 | 6/6/2014 | P | PASS |
Troy Cobbley
|
|
|
24 hour air test on Coolers passed
|
INSP-Sprinkler Rough-in | 6/4/2014 | 6/5/2014 | 6/5/2014 | A | PASS |
Troy Cobbley
|
|
|
Finished the 24 hour air test (passed) on the freezers at 7:15am this morning and began the 24 hour air test on the coolers at 1:00pm this afternoon
|
INSP-Sprinkler Rough-in | 6/3/2014 | 6/4/2014 | 6/4/2014 | A | PASS |
Troy Cobbley
|
|
|
24 hour air test started at 7:30 with 42psi on the guage. Piping in the racks and the freezer area passed. Branchline restraints are required to be installed in the freezer area.
|