INSP-Final Inspection | 7/24/2017 | 7/25/2017 | 7/25/2017 | P | PASS |
Jim Page
|
|
|
Final fire alarm inspection for area of work associated with this permit passed/complete
|
INSP-Final Inspection | 6/19/2014 | 6/20/2014 | 6/20/2014 | P | PART |
Forrest France
|
|
|
Verified 18ah batteries, points map has been provided- need to post as discussed, guard rail installed where horizontal projection exceeds IBC standard. 3rd floor damper tested- however opens on alarm, no access to test elevator tamper, plan modification to include DSC will be required prior to final.
|
INSP-Final Inspection | 3/7/2014 | 3/11/2014 | 3/11/2014 | A | PART |
Forrest France
|
|
|
Items noted include; install 18ah batteries per plan, post points map at the panel, repair damper 3rd floor, program input for sprinkler tamper at the elevator hoistway, submit plans reflecting omission of the dialer and zone card, the new FACP does not appear to meet IBC guidelines for horizontal projections at the means of egress (IBC 2012 1003.3.3). New smokes at the basement thru 3rd floors tested okay, verified signals, tested existing MP stations.
|