INSP-Final Inspection | 5/5/2014 | 5/5/2014 | 5/5/2014 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit work approved for final.
|
INSP-Final Inspection | 4/1/2014 | 4/1/2014 | 4/1/2014 | A | PART |
Forrest France
|
|
|
Okay to final once project finishes are complete.
|
INSP-Sprinkler Rough-in | 3/14/2014 | 3/17/2014 | 3/17/2014 | P | PART |
Forrest France
|
|
|
Verified coverage at the first floor lobby and reception areas post temp construction wall removal.
|
INSP-Sprinkler Rough-in | 2/17/2014 | 2/18/2014 | 2/18/2014 | A | PART |
Forrest France
|
|
|
Okay to cover overhead fire sprinkler modifications completed to date at the first floor remodel area.
|
INSP-Sprinkler Rough-in/Hydro | 2/17/2014 | 2/19/2014 | 2/17/2014 | A | CANC |
Forrest France
|
|
|
This is an oh hydro. Stefan is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 2/14/2014 | 2/18/2014 | 2/17/2014 | A | CANC |
Forrest France
|
|
|
Stefan is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 2/14/2014 | 2/14/2014 | 2/14/2014 | P | PART |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in | 2/10/2014 | 2/10/2014 | 2/10/2014 | A | PART |
Forrest France
|
|
|
Exam rooms 1st floor north end okayed for cover.
|
INSP-Sprinkler Rough-in | 1/28/2014 | 1/28/2014 | 1/28/2014 | P | PART |
Forrest France
|
|
|
Stefan is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus *1st floor partial insp.
|
INSP-Final Inspection | 1/9/2014 | 1/9/2014 | 1/9/2014 | P | PART |
Forrest France
|
|
|
Basement and 2nd floor work completed, final pending remainder of work at the 1st floor.
|
INSP-Sprinkler Rough-in | 12/30/2013 | 12/31/2013 | 12/31/2013 | A | PART |
Forrest France
|
|
|
Pendent head coverage at the remodel areas basement level completed acceptable- okayed for ceiling cover.
|
INSP-Sprinkler Rough-in | 12/30/2013 | 12/30/2013 | 12/30/2013 | P | PART |
Forrest France
|
|
|
Completed inspection for upright coverage at the basement level- noted adjustments necessary between hall 004 and conference room 005.
|
INSP-Sprinkler Rough-in | 12/5/2013 | 12/6/2013 | 12/18/2013 | P | PART |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in | 12/12/2013 | 12/13/2013 | 12/13/2013 | A | PART |
Forrest France
|
|
|
Okay to cover overhead fire sprinkler work at the second floor grid ceiling areas per the project scope.
|
INSP-Sprinkler Rough-in | 12/11/2013 | 12/11/2013 | 12/12/2013 | P | NR |
Forrest France
|
|
|
Stefan is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 12/4/2013 | 12/5/2013 | 12/6/2013 | A | DEFR |
Forrest France
|
|
|
Would it be possible to have this inspection anywhere from 9-noon. Stefan is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|