INSP-Alarm Testing | 9/11/2018 | 9/11/2018 | 9/11/2018 | P | PASS |
Lee G Meredith
|
|
|
Tested elevator shunt power monitoring and flashing firemans hat in elevator. Waiting for as built drawings and record of completion.
|
DOC - Permit Finaled | | | 9/11/2018 | | DONE |
|
|
|
System passed inspection all required documents provided.
|
INSP-Final Inspection | 9/10/2018 | 9/11/2018 | 9/10/2018 | P | CANC |
Jim Page
|
|
|
Building access is open, inspection technician is Ray McQueen Phone #: ###-#### >> Inspection requested via web by Rose Peterson Inspection cancelled from web by: Rose Peterson
|
INSP-Final Inspection | 1/2/2018 | 1/3/2018 | 1/3/2018 | A | CANC |
Troy Cobbley
|
|
|
Ray McQueen will be the technician. ###-####. Building access 8-5. Phone #: ###-#### Inspection requested via web by Rose Peterson
|
INSP-Final Inspection | 12/18/2017 | 12/18/2017 | 12/18/2017 | P | CANC |
Jim Page
|
|
|
Technician is Ray McQueen. Phone #: ###-#### >> Inspection requested via web by Rose Peterson Inspection cancelled from web by: Rose Peterson
|
INSP-Final Inspection | 6/24/2014 | 7/1/2014 | 7/1/2014 | A | FAIL |
Troy Cobbley
|
|
|
Need as-builts, need the 120 vac for the elevator monitored and the machine room smoke detector did not cause a flashing hat in the elevator car.
|
INSP-Final Inspection | 5/16/2014 | 5/20/2014 | 5/20/2014 | A | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for locations and types of corrections needed. They include the need for addirional audio/visual devices and atleast one new smoke detector. Several wall mounted smoke detectors need relocated closer to the ceiling. As-builts are needed as well as the testing of the elevator recall, EOL's and fire sprinkler devices.
|
INSP-Conference | 3/24/2014 | 3/25/2014 | 4/4/2014 | A | DONE |
Forrest France
|
|
|
Ray McQueen Phone #: ###-####
|
INSP-Conference | 3/20/2014 | 3/21/2014 | 3/21/2014 | A | DEFR |
Forrest France
|
|
|
ray Phone #: ###-####
|