INSP-Final Inspection | 11/26/2019 | 11/26/2019 | 11/26/2019 | A | PASS |
Jim Page
|
|
|
Final underground supply inspection has been completed, permit is finaled.
|
FIR-Aging Inspection | 12/18/2018 | 12/18/2018 | 12/24/2018 | | CANC |
Jim Page
|
|
|
Project is still under construction.
|
INSP-Sprinkler Rough-in/Hydro | 7/16/2018 | 7/17/2018 | 7/17/2018 | A | CANC |
Jim Page
|
|
|
Reuqest was for a main line flush, this request is cancelled and the correct request was generated.
Jeremy Phone #: ###-####
|
INSP-Supply line flush | 7/17/2018 | 7/17/2018 | 7/17/2018 | A | DONE |
Jim Page
|
|
|
Main line flush complete.
|
INSP-Supply line flush | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | FAIL |
Jim Page
|
|
|
Could not get water through the underground supply, main flush will need to be rescheduled.
Jeremy Phone #: ###-####
|
FIR-Aging Inspection | 4/5/2018 | 4/5/2018 | 4/6/2018 | | CANC |
Jim Page
|
|
|
Project is still under construction.
|
INSP-Sprinkler Rough-in | 3/4/2014 | 3/5/2014 | 3/5/2014 | A | PART |
Forrest France
|
|
|
Inspection for UG fire supply line completed at five exposed locations. Okayed for cover.
|