Permit Information
Permit NumberFIR14-00217
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1109 W MAIN ST Unit: 100
Project NameOWYHEE PLACE 2ND FLR MTNG TI
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration.

Fire sprinklers used for story, height, and area increase. To remodel the 2nd story meeting rooms and to construct a bridal room and storage room on the 2nd story. The total remodel area is about 6,643 square feet. Shell and core work was done under permit BLD13-00938. Work is to include interior nonbearing walls, new gypsum board on existing wall studs, new wall cavity insulation, new wall furring and insulation, suspended gypsum board ceilings, suspended acoustical ceilings, new folding partitions, and finishes. Special Inspection is required for the installation of the threaded Nelson Studs that will support the new folding partitions. The fire-resistance of the concrete encased beams is required to be maintained or restored. The work is required to comply with the approved drawings, with the plan review report, and will all applicable codes and ordinances. The fire sprinkler system shall comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/8/20147/11/20147/11/2014APASS
DetailsForrest France
Scope of fire sprinkler work passed final walkthrough.
INSP-Final Inspection7/1/20147/2/20147/2/2014PPART
DetailsForrest France
Walkthrough completed for the 2nd floor meeting room fire sprinkler finish work.
INSP-Sprinkler Rough-in6/10/20146/11/20146/11/2014APART
DetailsForrest France
Okayed remainder of overhead work at the future meeting rooms 2nd floor per the scope of work indicated on approved plans. Drop ceilings okay for cover.
INSP-Sprinkler Rough-in6/4/20146/5/20146/5/2014APART
DetailsForrest France
Okay to cover fire sprinkler work at the sheetrock ceilings and soffits as marked on approved plans in the meeting room areas 2nd floor east side.
INSP-Sprinkler Rough-in6/4/20146/4/20146/4/2014PPART
DetailsForrest France
INSP-Sprinkler Rough-in5/12/20145/13/20145/13/2014APART
DetailsForrest France
Verified seismic restraint at four locations west side.