INSP-Final Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 10/21/2014 | 10/22/2014 | 10/23/2014 | P | DEFR |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in | 10/22/2014 | 10/23/2014 | 10/23/2014 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 9/19/2014 | 9/19/2014 | 9/19/2014 | P | PASS |
Troy Cobbley
|
|
|
The 24 hour air test on all four dry pipe systems passed.
|
INSP-Sprinkler Rough-in/Hydro | 9/18/2014 | 9/18/2014 | 9/18/2014 | P | PASS |
Troy Cobbley
|
|
|
24 hour air test started on all four dry systems and 10:00am with the pressure marked in red on the guage.
|
INSP-Sprinkler Rough-in/Hydro | 9/16/2014 | 9/17/2014 | 9/17/2014 | A | PASS |
Troy Cobbley
|
|
|
Overhead 200lb hydro for all four new dry pipe systems passed
|
INSP-Sprinkler Rough-in | 9/9/2014 | 9/9/2014 | 9/9/2014 | P | PASS |
Troy Cobbley
|
|
|
Canopy 2/3 rough-in passed. Plan modifications are needed due to pipe routing changes and supply piping to the heads.
|
INSP-Sprinkler Rough-in | 8/19/2014 | 8/20/2014 | 8/20/2014 | A | PART |
Troy Cobbley
|
|
|
Rough-in passed for System 1 (east & west) except plan modification is needed showing the additional branchline in the remote area and pipe size changes. Rough-in passed for Systems 2 and 4. System 3 has not been inspected yet. Risers have not been inspect yet.
|