INSP-Final Inspection | 10/6/2014 | 10/6/2014 | 10/6/2014 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 10/1/2014 | 10/2/2014 | 10/2/2014 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Supply line flush | 9/30/2014 | 10/1/2014 | 10/1/2014 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed
|
INSP-Sprinkler Rough-in | 9/18/2014 | 9/18/2014 | 9/18/2014 | P | CANC |
Troy Cobbley
|
|
|
Brandon-underground flushing Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 9/16/2014 | 9/17/2014 | 9/17/2014 | P | CANC |
Troy Cobbley
|
|
|
Underground hydro - Brandon Phone #: ###-####
|
INSP-Sprinkler Rough-in | 9/4/2014 | 9/4/2014 | 9/4/2014 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Tenting passed. Piping can be covered.
|
INSP-Sprinkler Rough-in | 9/3/2014 | 9/4/2014 | 9/4/2014 | A | PASS |
Troy Cobbley
|
|
|
Piping can be covered.
|
INSP-Sprinkler Rough-in | 8/29/2014 | 8/29/2014 | 8/29/2014 | P | PASS |
Troy Cobbley
|
|
|
Piping rough-in passed. Piping can not be covered until the tenting has been corrected.
|
INSP-Sprinkler Rough-in/Hydro | 8/29/2014 | 8/29/2014 | 8/29/2014 | P | CANC |
Troy Cobbley
|
|
|
Riser is not built yet so not ready for hydro test. Will be rescheduled.
|
INSP-Sprinkler Rough-in | 7/9/2014 | 7/9/2014 | 7/9/2014 | P | PASS |
Troy Cobbley
|
|
|
Underground supply piping is ok to cover.
|