INSP-Final Inspection | 11/7/2014 | 11/10/2014 | 11/10/2014 | A | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final inspection. Missing escutcheon installed while on site. Surface mounted lights at the utility room adjacent to the garage to be turned 90deg to avoid obstruction to sprinkler coverage as discussed.
|
INSP-Sprinkler Rough-in | 9/4/2014 | 9/4/2014 | 9/5/2014 | P | PART |
Forrest France
|
|
|
Inspection for tenting completed okay after adjustments made while on site at one area 1st floor and 4 locations 2nd floor.
|
INSP-Sprinkler Rough-in/Hydro | 9/3/2014 | 9/4/2014 | 9/4/2014 | A | PART |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory.
|
INSP-Sprinkler Rough-in | 8/22/2014 | 8/22/2014 | 8/22/2014 | A | PART |
Troy Cobbley
|
|
|
The rough-in for the most part is passed. One pendant in the master bath needs to be relocated and plan modifications are needed to be submitted due to new riser location and minor pipe re-routing. Tenting has not been completed yet so no piping can be covered.
|
INSP-Sprinkler Rough-in | 8/21/2014 | 8/21/2014 | 8/22/2014 | P | CANC |
Troy Cobbley
|
|
|
Rescheduled for tomorrow. Johnathon Phone #: ###-####
|