INSP-Final Inspection | 8/10/2014 | 8/11/2014 | 8/11/2014 | A | PASS |
Forrest France
|
|
|
Corrections completed. Final inspection passed, fire alarm permit finaled.
|
INSP-Final Inspection | 8/8/2014 | 8/8/2014 | 8/8/2014 | A | PART |
Forrest France
|
|
|
Verified previous correction items including requested plan mod. Kitchen hood, sprinkler monitoring, and duct detectors tested okay. Final pending voice amplifier repair and points map to be posted at the panel.
|
INSP-Alarm Testing | 8/4/2014 | 8/4/2014 | 8/4/2014 | P | PART |
Forrest France
|
|
|
Completed satisfactory testing of the voice evac and occupant notification appliances. MP stations and SD at the panel tested okay. Items needed prior to final include tie-in and monitoring of the ansul system, test duct detectors and fire sprinkler monitoring, post signage at the door the FACP room. Provide plan modification to reflect changes in field installation from original design including zones, one-lines, location of the panel, number of initiating devices, etc.
|