Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberFIR14-00471
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 7009 W FRANKLIN RD
Project NameBishiop Kelly HS Library Remod
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of connecting to an existing 3" tee supplied from system #3. In additiona, install new main, branch lines and arm overs to protect the new library addition. The existing sprinklers in the existing library supplied by system #1will also relocated and replaced.

(BISHOP KELLY HIGH SCHOOL – Library Addition/Renovation) Permit to add an addition of 4,787 square feet to the center of the building by expanding the library into the existing interior court. This building is sprinklered for allowable area increase. Work is to include: construction of new foundation and exterior shell, [construction of interior non-bearing walls to create a reading and print room], installation of new accessible doors / hardware, new electrical, new mechanical and interior finishes. NOTE: This building is fire sprinklered for area increase. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/5/201411/6/201411/6/2014APASS
DetailsForrest France
Scope of fire sprinkler work passed final inspection.
INSP-Sprinkler Rough-in10/8/201410/8/201410/8/2014PPASS
DetailsTroy Cobbley
Rough-in passed on the existing piping area. Piping can be covered.
INSP-Sprinkler Rough-in/Hydro10/7/201410/7/201410/7/2014PPASS
DetailsTroy Cobbley
The overhead hydro passed
INSP-Sprinkler Rough-in9/19/20149/22/20149/22/2014APASS
DetailsTroy Cobbley
Combustible concealed spaces are ok to cover. They have been filled with insulation.
INSP-Sprinkler Rough-in9/9/20149/9/20149/9/2014PPASS
DetailsTroy Cobbley
New piping rough-in passed. I noted that new combustible concealed spaces have been formed and will need addressed before approval for cover can be given.
INSP-Sprinkler Rough-in/Hydro7/24/20147/24/20147/25/2014PCANC
DetailsTroy Cobbley
Mark is the contact. Thanks Phone #: ###-#### Inspection requested via web by Stan Beus