Permit Information
Permit NumberFIR14-00478
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 1105 S LA POINTE ST
Project NameSherwood Apartments
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of 6”x11’ of C-900 piping with fittings and thrust blocks.

Residential 1: This apartment building is being divided into two buildings by a fire wall - New construction of a 4 story building on a 1.28 acre site

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/2/20159/3/20159/3/2015APASS
DetailsThomas Walsh
Final inspection of fire service U/G supply.
PASSED
NOTE: Heat tracing of wet pipe bulk mains running through parking garage has been determined not to be required.
INSP-Sprinkler Rough-in5/28/20155/29/20155/29/2015ACANC
DetailsThomas Walsh
This is a rough to cover inspection for the parking garage. The contact is Mark. Thanks! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in5/21/20155/22/20155/22/2015PCANC
DetailsThomas Walsh
This is for the 4th floor, Area 3 soffits. Mark is the contact. Thanks. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in5/14/20155/15/20155/16/2015PPASS
DetailsThomas Walsh
Rough in inspection of unit soffits for 4th floor section 1 area - units 400 thru 441
INSP-Sprinkler Rough-in4/30/20155/1/20155/1/2015APART
DetailsScott Arellano
Rough in.
INSP-Sprinkler Rough-in2/12/20152/13/20152/13/2015APART
DetailsForrest France
UG fire supply line flush completed satisfactory.
INSP-Sprinkler Rough-in/Hydro2/12/20152/12/20152/12/2015PCANC
DetailsForrest France
This is an UG/Hydro inspection. Jeremiah is your contact. Please call 1/2 hour prior to inspection. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in9/24/20149/24/20149/24/2014PPART
DetailsForrest France
UG fire supply line including the IBR, thrust block and stub to a point 14' beyond the stem wall approved for bury.