INSP-Final Inspection | 3/25/2015 | 3/25/2015 | 3/25/2015 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 2/5/2015 | 2/6/2015 | 2/6/2015 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations marked where piping can be covered.
|
INSP-Sprinkler Rough-in | 2/3/2015 | 2/4/2015 | 2/4/2015 | A | CANC |
Troy Cobbley
|
|
|
Wrong permit number called in.
|
INSP-Sprinkler Rough-in | 2/3/2015 | 2/4/2015 | 2/3/2015 | P | CANC |
Troy Cobbley
|
|
|
This is an Visual OH/RTC inspection. Mike S is your contact. Please call 1/2 hour prior to inspection. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 12/4/2014 | 12/5/2014 | 12/5/2014 | P | PART |
Troy Cobbley
|
|
|
The sprinkler rough-in has generally passed and the piping above hardlids can be covered. There are several problems 1. The exterior walls have wood sheating with only insulation and a vapor barrier and no upright sprinkler protection, 2. Earth quake bracing is not attached to the building structure but is attached to the wall studs, 3. Ball drip is mounted outside of the building, 4. Approved plans show all branchlines coming from the sides of the main but as installed all branchlines come off of the main piping on riser nipples which will effect the hydraulic calculations. Plans need to be resubmitted.
|
INSP-Sprinkler Rough-in/Hydro | 10/1/2014 | 10/1/2014 | 10/1/2014 | P | PASS |
Troy Cobbley
|
|
|
The underground hydro test passed
|
INSP-Sprinkler Rough-in/Hydro | 9/19/2014 | 9/22/2014 | 9/22/2014 | P | CANC |
Troy Cobbley
|
|
|
Cancel per Mike due to no access to riser because of concrete and United Water has not turned on the site water yet.
|
INSP-Sprinkler Rough-in | 8/21/2014 | 8/22/2014 | 8/22/2014 | P | PASS |
Troy Cobbley
|
|
|
Underground supply piping is ok for cover.
|