Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR14-00578
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 6784 W IRVING ST
Project NameAberdeen 4-Plex: 6784 Irving
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of protecting a 4-unit apartment building. CPVC pipe and extended throw residential sprinklers are being utilized.

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.

To construct a new 3,810 sq. ft., two story, Four unit, apartment building. Each unit has two bedrooms, and two bathrooms. The 1st story units are required to be Type 'B' units. All units share a common path of egress into and through a 1-hour rated exit corridor with 20 minute fire-resistive, listed, labeled, self-closing door assemblies from the dwelling units into the corridor. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour fire-partitions and one hour horizontal assemblies are required between dwelling units.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/26/20151/27/20151/27/2015PPASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection1/23/20151/27/20151/27/2015APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection1/22/20151/23/20151/23/2015PCANC
DetailsTroy Cobbley
cancelle per Pat. frozen pipe// Mike M is your contact. Please call 1/2 hour prior to inspection. Phone #: ###-#### >> Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro1/19/20151/20/20151/20/2015PPASS
DetailsTroy Cobbley
Underground flush passed
INSP-Sprinkler Rough-in/Hydro12/17/201412/18/201412/18/2014PPASS
DetailsTroy Cobbley
The tenting and rough-in and hydro test for the overhead passed. Piping can be covered.
INSP-Sprinkler Rough-in/Hydro12/17/201412/17/201412/17/2014PPASS
DetailsTroy Cobbley
Rough-in passed. Tenting failed. No time to perform a hydro test
INSP-Sprinkler Rough-in12/15/201412/16/201412/16/2014PFAIL
DetailsTroy Cobbley
Tenting has not been repaired. Piping can not be covered.
INSP-Sprinkler Rough-in12/10/201412/11/201412/11/2014AFAIL
DetailsForrest France
Tenting at the second floor is not adequate, missing and partial insulation coverage at some locations. Noted one open outlet. Sheetrock cover is not approved at this time.
INSP-Sprinkler Rough-in9/15/20149/16/20149/16/2014APASS
DetailsTroy Cobbley
Underground supply is ok to cover.