INSP-Final Inspection | 4/1/2015 | 4/2/2015 | 4/2/2015 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 9/3/2014 | 9/4/2014 | 9/4/2014 | A | PART |
Forrest France
|
|
|
Verified plan modification. Remainder of overhead work approved for cover.
|
INSP-Sprinkler Rough-in | 8/25/2014 | 8/26/2014 | 8/26/2014 | A | PART |
Forrest France
|
|
|
Two offices as marked on plan and indicated on the scope of work are okay for cover. However, noted three additional locations in need of sprinkler coverage adjustments due to tenant remodel work-
|