DOC - Permit Finaled | | | 1/10/2019 | | DONE |
|
|
|
Informed by Chrissten Gregory that the hydro test was completed and passed with no other work required.
|
INSP-Sprinkler Rough-in/Hydro | 9/26/2014 | 9/29/2014 | 9/29/2014 | A | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed
|
INSP-Sprinkler Rough-in | 9/23/2014 | 9/24/2014 | 9/24/2014 | A | PASS |
Troy Cobbley
|
|
|
Last part of underground ok to cover
|
INSP-Sprinkler Rough-in | 9/11/2014 | 9/11/2014 | 9/11/2014 | P | PASS |
Troy Cobbley
|
|
|
Approved cover for partial underground. See the city approved plans for locations.
|