INSP-Final Inspection | 12/10/2014 | 12/11/2014 | 12/12/2014 | A | PART |
Craig D. Hanson
|
|
|
Exit signs need added in 3 locations. back middle of salesa floor, and each side of front of sales floor.
|
INSP-Sprinkler Rough-in | 11/4/2014 | 11/4/2014 | 11/4/2014 | P | PASS |
Troy Cobbley
|
|
|
Dry sidwalls located under the front canopy passed inspection.
|
INSP-Sprinkler Rough-in | 10/31/2014 | 10/31/2014 | 10/31/2014 | P | PASS |
Troy Cobbley
|
|
|
Remaining office area ceilings can be installed to cover piping.
|
INSP-Sprinkler Rough-in/Hydro | 10/16/2014 | 10/17/2014 | 10/17/2014 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro and riser rough-in passed.
|
INSP-Sprinkler Rough-in | 10/14/2014 | 10/14/2014 | 10/14/2014 | P | PART |
Troy Cobbley
|
|
|
Rough-in passed for exposed pipe. Still need cover inspections for areas where ceilings are not complete yet. Also riser has not been built/inspected yet.
|
INSP-Sprinkler Rough-in | 9/24/2014 | 9/24/2014 | 9/24/2014 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations where piping can be covered by the new hardlids.
|