Permit Information
Permit NumberFIR14-00659
StatusFinaled
Name MICRON TECHNOLOGY INC FP
Site Address 8000 S FEDERAL WAY
Project NameMicron Bldg 15 - First Floor
Customer NumberC21720
ePlanReviewNo
Description
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration.

Micron Building #15 - (C21720) - Fab Remodel – Permit to remodel approximately 11,180 S.F. of space in B15 on the 1st Floor between gridlines 11 & 2 and G & L to accommodate a processing area for “SPECTECH”. Work to include: installation of new ceiling grid system, installation of new lighting / switching, construction of new interior non-load bearing walls to define this area off from the rest, modify the corridor to accommodate new entrance (Corridor downgraded), installation of new interior doors / accessible hardware, minor mechanical modifications, minor electrical, and interior finishes.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/26/20151/27/20151/28/2015APASS
DetailsForrest France
Scope of work completed, final walkthrough finished. Hydrostatic test passed.
INSP-Sprinkler Rough-in/Hydro1/5/20151/6/20151/6/2015PPART
DetailsForrest France
Overhead work approved for cover between grid lines 9 and 11 north end as noted on plans. Rough-in of new branchlines and main at the remainder of grid ceilings okayed. Final hydrostatic test to be finished once drops are installed, heads relocated and old sprinklers are replaced per the scope of work.