INSP-Final Inspection | 1/9/2015 | 1/12/2015 | 1/12/2015 | A | PASS |
Forrest France
|
|
|
Final inspection and functional testing completed. Low air switch adjusted while on site. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 1/6/2015 | 1/7/2015 | 1/7/2015 | P | PART |
Forrest France
|
|
|
Concluded satisfactory pneumatic test of the new dry system.
|
INSP-Sprinkler Rough-in/Hydro | 1/2/2015 | 1/6/2015 | 1/6/2015 | P | PART |
Forrest France
|
|
|
Begin 24 hr. air test of the new dry system at 44 1/2 psig @2:00 PM.
|
INSP-Sprinkler Rough-in/Hydro | 12/30/2014 | 1/2/2015 | 1/2/2015 | P | PART |
Forrest France
|
|
|
Rough-in inspection completed for new rack system sprinkler piping and modifications to existing overhead coverage. Noted one missing sprig to be added per plan note #15. Discussed 24 hr. air test.
|